{"id":4160,"date":"2019-05-27T09:11:02","date_gmt":"2019-05-27T08:11:02","guid":{"rendered":"http:\/\/www.inmesol.com\/blog\/?p=4160"},"modified":"2026-01-21T11:54:16","modified_gmt":"2026-01-21T11:54:16","slug":"uninterrupted-inmesol-power-during-the-construction-of-al-rayyan-stadium-for-the-world-cup-in-qatar","status":"publish","type":"post","link":"https:\/\/www.inmesol.com\/en\/blog\/uninterrupted-inmesol-power-during-the-construction-of-al-rayyan-stadium-for-the-world-cup-in-qatar\/","title":{"rendered":"Uninterrupted INMESOL power during the construction of Al Rayyan Stadium for the 2022 World Cup in Qatar"},"content":{"rendered":"<h3>The system, consisting of 4 generators, works in parallel for 24 hours<\/h3>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignleft size-medium wp-image-4161\" src=\"\/wp-content\/uploads\/2019\/05\/uninterrupted-inmesol-power-during-the-construction-of-al-rayyan-stadium-for-the-2022-world-cup-in-qatar.png\" alt=\"\" width=\"202\" height=\"300\" title=\"\">On <strong>21 November 2022<\/strong>, the <strong>greatest football cup<\/strong>, organised by <strong>FIFA<\/strong> (International Federation of Association Football), will start: The <strong>2022 World Cup in Qatar.<\/strong><\/p>\n<p>The <strong>countdown<\/strong>, a little less than three years, to get all the <strong>stadiums<\/strong> and <strong>infrastructures <\/strong>for such an event<strong> ready and in optimum conditions<\/strong>, so that everything goes as planned by the<strong> organisation<\/strong>, begins.<\/p>\n<p>There will be <strong>12 stadiums<\/strong> to host this cup; some of them are already finished, but others are still under construction, as is the case of the <strong>Al Rayyan Stadium<\/strong>, whose <strong>completion <\/strong>is intended for<strong> the end <\/strong>of this year, <strong>2019<\/strong>.<\/p>\n<figure id=\"attachment_4162\" aria-describedby=\"caption-attachment-4162\" style=\"width: 750px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-4162 size-full lazyload\" data-src=\"\/wp-content\/uploads\/2019\/05\/uninterrupted-inmesol-power-during-the-construction-of-al-rayyan-stadium-for-the-2022-world-cup-in-qatar.jpg\" alt=\"\" width=\"750\" height=\"431\" title=\"\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 750px; --smush-placeholder-aspect-ratio: 750\/431;\" data-srcset=\"https:\/\/www.inmesol.com\/wp-content\/uploads\/2019\/05\/uninterrupted-inmesol-power-during-the-construction-of-al-rayyan-stadium-for-the-2022-world-cup-in-qatar.jpg 750w, https:\/\/www.inmesol.com\/wp-content\/uploads\/2019\/05\/uninterrupted-inmesol-power-during-the-construction-of-al-rayyan-stadium-for-the-2022-world-cup-in-qatar-300x172.jpg 300w\" data-sizes=\"auto\" data-original-sizes=\"(max-width: 750px) 100vw, 750px\"><figcaption id=\"caption-attachment-4162\" class=\"wp-caption-text\">Al Rayan Stadium design infographics<\/figcaption><\/figure>\n<p>In order to achieve this, work is being done on <strong>forced marches<\/strong> and there is an intense construction work.<\/p>\n<p>The supply of electrical power must be <strong>ensured, <\/strong>and it shall be <strong>uninterrupted <\/strong>to <strong>keep up <\/strong>and <strong>finish <\/strong>the stadium on the <strong>planned date<\/strong>.<\/p>\n<p>Once again, <strong>INMESOL gensets<\/strong> have been chosen at a time when <strong>reliability is crucial.<\/strong><\/p>\n<p>3 generators model IV\u2010700 and 1 generator model IV\u2010440 have been installed. They work for <strong>24 hours in parallel<\/strong>. Control units feature <strong>different programming options <\/strong>so that their function is adapted to the power <strong>demand.<\/strong><\/p>\n<figure id=\"attachment_4164\" aria-describedby=\"caption-attachment-4164\" style=\"width: 774px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"size-full wp-image-4164 lazyload\" data-src=\"\/wp-content\/uploads\/2019\/05\/1_uninterrupted-inmesol-power-during-the-construction-of-al-rayyan-stadium-for-the-2022-world-cup-in-qatar.jpg\" alt=\"\" width=\"774\" height=\"438\" title=\"\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 774px; --smush-placeholder-aspect-ratio: 774\/438;\" data-srcset=\"https:\/\/www.inmesol.com\/wp-content\/uploads\/2019\/05\/1_uninterrupted-inmesol-power-during-the-construction-of-al-rayyan-stadium-for-the-2022-world-cup-in-qatar.jpg 774w, https:\/\/www.inmesol.com\/wp-content\/uploads\/2019\/05\/1_uninterrupted-inmesol-power-during-the-construction-of-al-rayyan-stadium-for-the-2022-world-cup-in-qatar-300x170.jpg 300w, https:\/\/www.inmesol.com\/wp-content\/uploads\/2019\/05\/1_uninterrupted-inmesol-power-during-the-construction-of-al-rayyan-stadium-for-the-2022-world-cup-in-qatar-768x435.jpg 768w\" data-sizes=\"auto\" data-original-sizes=\"(max-width: 774px) 100vw, 774px\"><figcaption id=\"caption-attachment-4164\" class=\"wp-caption-text\">INMESOL gensets supplying power 24 hours a day for the construction of the stadium<\/figcaption><\/figure>\n<p>The <strong>Al Rayyan Stadium<\/strong> is being built where the old Ahmed bin Ali Stadium was and, although its remodelling was first considered, it has finally been demolished, and a completely <strong>new<\/strong> stadium, with capacity for 40 thousand people, has been designed.<\/p>\n<p>Its design has been inspired by the dunes and desert surrounding the country.<\/p>\n<div class=\"video-responsive\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Once again, INMESOL gensets have been chosen at a time when reliability is crucial.3 generators model IV\u2010700 and 1 generator model IV\u2010440 have been installed. They work for 24 hours in parallel.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[39,33],"tags":[],"categorias-smart-power-":[],"paises-":[],"class_list":["post-4160","post","type-post","status-publish","format-standard","hentry","category-news-generators-sets","category-ingles"],"_links":{"self":[{"href":"https:\/\/www.inmesol.com\/en\/wp-json\/wp\/v2\/posts\/4160","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.inmesol.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.inmesol.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.inmesol.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.inmesol.com\/en\/wp-json\/wp\/v2\/comments?post=4160"}],"version-history":[{"count":0,"href":"https:\/\/www.inmesol.com\/en\/wp-json\/wp\/v2\/posts\/4160\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.inmesol.com\/en\/wp-json\/wp\/v2\/media?parent=4160"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.inmesol.com\/en\/wp-json\/wp\/v2\/categories?post=4160"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.inmesol.com\/en\/wp-json\/wp\/v2\/tags?post=4160"},{"taxonomy":"categorias-smart-power-","embeddable":true,"href":"https:\/\/www.inmesol.com\/en\/wp-json\/wp\/v2\/categorias-smart-power-?post=4160"},{"taxonomy":"paises-","embeddable":true,"href":"https:\/\/www.inmesol.com\/en\/wp-json\/wp\/v2\/paises-?post=4160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}